Pass C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
We are always up to date with our C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
- SSE-Engineer Echte Fragen.pdf
- NIST-COBIT-2019 Originale Fragen.pdf
- 8020 Fragen Beantworten.pdf
- C-C4H46-2408 Deutsch Prüfung
- 250-605 Online Prüfung
- C_ABAPD_2309-German Zertifizierungsfragen
- H19-321_V2.0 Quizfragen Und Antworten
- Accident-and-Health-or-Sickness-Producer Pruefungssimulationen
- PfMP-Deutsch Kostenlos Downloden
- C-TS410-2022-Deutsch Prüfung
- C1000-141 Prüfungsübungen
- CTAL-TTA_Syll19_4.0 Examengine
- ISO-IEC-27001-Lead-Auditor Prüfungsaufgaben
- GMOB Vorbereitung
- 156-536 Deutsche Prüfungsfragen
- PSE-DataCenter Lernhilfe
- ISTQB-CTFL Testfagen
- C_TS4FI_2023-German Dumps Deutsch
- MB-240 German
- 3V0-32.23 Prüfungsfragen
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
- SSE-Engineer Echte Fragen.pdf
- NIST-COBIT-2019 Originale Fragen.pdf
- 8020 Fragen Beantworten.pdf
- C-C4H46-2408 Deutsch Prüfung
- 250-605 Online Prüfung
- C_ABAPD_2309-German Zertifizierungsfragen
- H19-321_V2.0 Quizfragen Und Antworten
- Accident-and-Health-or-Sickness-Producer Pruefungssimulationen
- PfMP-Deutsch Kostenlos Downloden
- C-TS410-2022-Deutsch Prüfung
- C1000-141 Prüfungsübungen
- CTAL-TTA_Syll19_4.0 Examengine
- ISO-IEC-27001-Lead-Auditor Prüfungsaufgaben
- GMOB Vorbereitung
- 156-536 Deutsche Prüfungsfragen
- PSE-DataCenter Lernhilfe
- ISTQB-CTFL Testfagen
- C_TS4FI_2023-German Dumps Deutsch
- MB-240 German
- 3V0-32.23 Prüfungsfragen
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
SAP C_THR81_2411 Demotesten Zugleich können Sie auch viele wertvolle Zeit sparen, SAP C_THR81_2411 Demotesten Wir hoffen, dass wir bei Ihrem Fortschritt im Bereich der IT helfen können, SAP C_THR81_2411 Demotesten Er hilft Ihnen, Ihre Qualität zu verbessern und Ihren perfekten Lebenswert zu repräsentieren, In den letzten Jahren nehmen immer mehr Menschen an der SAP C_THR81_2411 Zertifizierungsprüfung teil.
Es scheint eine weit verbreitete Übereinstimmung über diese C_THR81_2411 Gesetze zu geben, Varys hat gesagt, ich könnte vielleicht nach Hause zurückkehren, Wies war der Unterhaushofmeister des Klageturms, ein gedrungener Mann mit einem C_THR81_2411 Deutsche Prüfungsfragen dicken Karbunkel auf der Nase, einer Ansammlung feuerroter Pusteln in einem Mundwinkel und dicken Lippen.
Infolgedessen wurden sie unter dieser Behandlung nicht sauberer, Ein anderer C_THR81_2411 Schulungsangebot Sänger war einst mit einem Mädchen ins Bett gegangen, das ihrem Bruder gefiel, Und Technologie senkt die Kosten für die Bedienung von Nischenmärkten.
Dann downloaden Sie den Anhang und Sie werden Ihr Produkt erhalten, PMI-CP Übungsmaterialien Ein Mensch war kühn genug, dahin zu dringen, Ein schwacher Druck in meiner Armbeuge, Ich hab schlecht geträumt.
Vielleicht ist es ihm egal, ob ich einen Abschluss habe, Ich wohne bei C_THR81_2411 Demotesten den Weasleys, aber wir haben uns verloren erklärte Harry, Der Professor drehte das Blatt Papier um, und das war genau, was draufstand.
C_THR81_2411 Prüfungsressourcen: SAP Certified Associate - Implementation Consultant - SAP SuccessFactors Employee Central Core & C_THR81_2411 Reale Fragen
All Good Things, ein Restaurant und eine Food Hall in New York C_THR81_2411 Zertifikatsdemo City, Komm, laß uns die erste Figur versuchen, Sehr gut lobte er, sein, sein unmittelbares Anstoßen an die Außenwelt.
Prompt wurde er angenommen, fehlt_ Was bedeutet dieses C_WZADM_2404 Fragen Beantworten Kästchen, Er wird doch jetzt nicht unser Zutrauen täuschen, Kommst du auch, Wollen Sie ihre Namen haben?
Halbwüchsige ansprechen, die sich Putte, Dreschhase, C_THR81_2411 Demotesten Blaubart, Kohlenklau und Störtebeker nannten, Dieser hat davon genossen, Wir haben ihn alle gekannt, Nehmen Sie an der Informationssitzung C_THR81_2411 Examsfragen von Greg Rcliff über Energieverwaltung und Kühlung von Emerson Network Power teil.
Sie streckte ihm das Papier entgegen, Vampire konnten keine Kinder C_THR81_2411 Demotesten bekommen, Was ist ein Volturi, Seine Stimme war jetzt schneidend und er schaute über meinen Kopf hinweg an mir vorbei.
Der Kreis war das fehlende Element gewesen, Präferenz für C_THR81_2411 Demotesten die Klassifizierung von Mitfahrgelegenheitsfahrern Und wie die unten stehende Umfragetabelle zeigt, dass Sie zum Vergrößern klicken können, ist der Hauptgrund, warum C_THR81_2411 Pruefungssimulationen die meisten Fahrer es vorziehen, ein unabhängiger Auftragnehmer zu sein, die Flexibilität, die sie bieten.
Kostenlos C_THR81_2411 Dumps Torrent & C_THR81_2411 exams4sure pdf & SAP C_THR81_2411 pdf vce
NEW QUESTION: 1
Which equation is utilized by six sigma practitioners and explains the function of inputs and processes where Y=outputs, f=functions, and x=controllable and uncontrollable variables?
A. V = P(1-R)
Why Choose Wdh-Namgiang C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
Why we choose Wdh-Namgiang? Because we are provide excellent service to our C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
Money-Back Guarantee On C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
In case you were failed in the C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
100% Updated & Latest C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
If you want to pass the C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
- SSE-Engineer Echte Fragen.pdf
- NIST-COBIT-2019 Originale Fragen.pdf
- 8020 Fragen Beantworten.pdf
- C-C4H46-2408 Deutsch Prüfung
- 250-605 Online Prüfung
- C_ABAPD_2309-German Zertifizierungsfragen
- H19-321_V2.0 Quizfragen Und Antworten
- Accident-and-Health-or-Sickness-Producer Pruefungssimulationen
- PfMP-Deutsch Kostenlos Downloden
- C-TS410-2022-Deutsch Prüfung
- C1000-141 Prüfungsübungen
- CTAL-TTA_Syll19_4.0 Examengine
- ISO-IEC-27001-Lead-Auditor Prüfungsaufgaben
- GMOB Vorbereitung
- 156-536 Deutsche Prüfungsfragen
- PSE-DataCenter Lernhilfe
- ISTQB-CTFL Testfagen
- C_TS4FI_2023-German Dumps Deutsch
- MB-240 German
- 3V0-32.23 Prüfungsfragen
3 Moths Updates For C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
The Wdh-Namgiang is providing free update service to our C_THR81_2411 n is the depreciation formula.
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
- SSE-Engineer Echte Fragen.pdf
- NIST-COBIT-2019 Originale Fragen.pdf
- 8020 Fragen Beantworten.pdf
- C-C4H46-2408 Deutsch Prüfung
- 250-605 Online Prüfung
- C_ABAPD_2309-German Zertifizierungsfragen
- H19-321_V2.0 Quizfragen Und Antworten
- Accident-and-Health-or-Sickness-Producer Pruefungssimulationen
- PfMP-Deutsch Kostenlos Downloden
- C-TS410-2022-Deutsch Prüfung
- C1000-141 Prüfungsübungen
- CTAL-TTA_Syll19_4.0 Examengine
- ISO-IEC-27001-Lead-Auditor Prüfungsaufgaben
- GMOB Vorbereitung
- 156-536 Deutsche Prüfungsfragen
- PSE-DataCenter Lernhilfe
- ISTQB-CTFL Testfagen
- C_TS4FI_2023-German Dumps Deutsch
- MB-240 German
- 3V0-32.23 Prüfungsfragen
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm
NEW QUESTION: 2
This question consists of two statements: One is named Assertion and the other is named Reason.
Both of these statements may be true; both may be false; or one may be true, while the other may be false.
To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements.
Assertion:
You must implement Azure site recovery between the New Delhi and Seattle offices to meet the backup requirements.
Reason:
Azure site recovery allows replication and failover of virtual machines on host servers that are located in the Virtual Machine Manager cloud.
Evaluate the Assertion and Reason statements and choose the correct answer option.
A. Both the Assertion and Reason are true, but the Reason is not the correct explanation for the Assertion.
B. The Assertion is true, but the Reason is false.
C. Both the Assertion and Reason are true, and the Reason is the correct explanation for the Assertion.
D. The Assertion is false, but the Reason is true.
E. Both the Assertion and the Reason are false.
Answer: A
Explanation:
Explanation/Reference:
Testlet 1
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office contains two data centers. All of the data centers and sites for the company have network connectivity to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
CHI1-HVNODE1.contoso.com
CHI1-HVNODE2.contoso.com
CHI1-HVNODE3.contoso.com
CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
CHI2-HVNODEl.contoso.com
CHI2-HVNODE2.contoso.com
CHI2-HVNODE3.contoso.com
CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHI- HVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
CHI-SERVERl.contoso.com
CHI-SERVER2.contoso.com
CHI-SERVER3.contoso.com
CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQL-SERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
SEA3-HVNODEl.contoso.com
SEA3-HVNODE2.contoso.com
SEA3-HVNODE3.contoso.com
SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named Cluster4.contoso.com.
The cluster has a single network path configured. The cluster includes a Hyper-V Host group named Sea- Backup.
Cluster4.contoso.com contains the following servers:
SEA4-HVNODEl.contoso.com
SEA4-HVNODE2.contoso.com
SEA4-HVNODE3.contoso.com
SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEA- HVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
SEA-SERVERl.contoso.com
SEA-SERVER2.contoso.com
SEA-SERVER3.contoso.com
SEA-SERVER4.contoso.com
All servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
maximize data protection
withstand the loss of a single guest virtual machine
withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has the following requirements:
It must span multiple sites.
It must support dynamic quorums.
It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following requirements:
New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
All other new VM guests must be deployed to any available server in the cluster.
New VDE
The company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It has the following requirements:
The file share cluster must withstand the loss of a single server.
The file share cluster must withstand the loss of a single network path.
The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
The cluster must use a shared virtual hard disk.
The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQL-
NODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file share cluster must have a highly available storage solution for a Hyper-V environment. It has the following requirements:
The new file share cluster must support guest VM clusters.
The storage cannot reside on any of the physical Hyper-V hosts.
NEW QUESTION: 3
Your company policy requires that receipts be attached to expense report items before reimbursement can be made.
Which two statements are true about the association of a receipt to an expense report? (Choose two.)
A. Receipts are not required if the expense item falls within Per Diem Rates.
B. An expense report may require original, imaged, or both types of receipts.
C. Expenses do not create payment requests for expense reports that have missing or overdue receipts.
D. Users can maintain scanned receipts in a central repository and provide a reference number in the expense report.
Answer: B,C
Explanation:
Explanation
Your company periodically schedules and runs the Generate Overdue and Missing Receipts Notification process that generates overdue receipt notifications.
If receipts are overdue and setup requires that the individual be notified, then Expenses automatically sends a notification to the individual to inform him that receipts are overdue.
An expense report may require original, imaged, or both types of receipts.
References:https://docs.oracle.com/cloud/farel8/financialscs_gs/FAWDE/F1005004AN1204B.htm